Bridges and Tunnels/Footbridges
The total span length of bridge is 30m and the width is 3m. The bridge girder is a box-shaped truss. The abutments are also orthogonal trusses and disposing one elevator each. Staircases are provided perpendicular to the bridge axis. Foundation on bored piles. The initial structural design was performed by the office OMETE SA. KALLIERGOS OTM SA re-designed the footbridge after modifying abutments and staircases.
CLIENT | ERGOSE |
PERIOD | 2014 |
CONTRACTOR | INTRAKAT |
TYPE | Footbridges |
MATERIAL | Steel |
LOCATION | Greece |