CLIENT: State of Kuwait

12/10/2023

CONTRACTOR ARCHIRODON ㅡ PERIOD: 2013

The scope of work was the preliminary tender design of DOHA LINK Project and was assigned at KALLIERGOS OTM by the contractor ARCHIRODON. For the accurate estimation of quantities, both calculations and drawings were performed at an advanced level for all structures as follows : • Dual overseas bridge of 7 Km total length. The bridge comprises 123 spans on piers with steel piles foundations. The bridge deck is provided with precast-prestressed segments. • Three interchanges comprising bridges and retaining structures. • One composite bridge spanning 74m over existing pipelines.